Old Roosevelt Bridge
Live status of Old Roosevelt Bridge updates in real time in the IsBridgeUp app; typical patterns are below.
Opening schedule
The draw opens on signal, except that it need not open while the adjacent Florida East Coast Railroad bridge is closed to navigation; it opens immediately once that railroad bridge reopens, to pass all waiting vessels.
Regulation: 33 CFR 117.317(c)
Monthly opening statistics — June 2026
Openings by hour of day (ET)
Based on 25 days with FL511 data in June 2026.
Vessel traffic — June 2026
By vessel type
- Recreational14
- Towing / tug0
- Passenger0
- Cargo / tanker0
- Other / unknown0
Counts include AIS-broadcasting vessels only; actual vessel traffic is higher.
About the bridge
A crossing has carried the Dixie Highway over the St. Lucie River at Stuart since 1918, when a swing bridge named for Henry Flagler first spanned the water. In 1934 a bascule drawbridge, funded by President Franklin D. Roosevelt's New Deal, opened in its place and took the Roosevelt name. The bridge standing today was built alongside it in 1964. When the high-level fixed Roosevelt Bridge opened in 1996, U.S. 1 was rerouted onto the new span, the 1934 bascule was demolished — a small abandoned stub still stands on the north bank — and the 1964 drawbridge was kept for local traffic on County Road 707. It is owned by the Florida Department of Transportation.
Physical characteristics
| Vertical clearance, closed (MHW) | 14 ft |
| Horizontal clearance | 58 ft |
| Bridge type | bascule |
| Year built | 1964 |
| Owner | Florida DOT (FDOT) |
| VHF channel (bridge tender) | Ch 9 |
Road traffic
Annual average daily traffic (AADT): 10,200
Frequently asked questions
- Is Old Roosevelt Bridge open right now?
- Old Roosevelt Bridge opens and closes for vessel traffic throughout the day. Live status is available on this page and updates in real time in the IsBridgeUp app.
- How often does Old Roosevelt Bridge open?
- In June 2026, Old Roosevelt Bridge opened 324 times — about 13 openings per day, with an average opening lasting 6.2 minutes.
- What is the opening schedule for Old Roosevelt Bridge?
- The draw opens on signal, except that it need not open while the adjacent Florida East Coast Railroad bridge is closed to navigation; it opens immediately once that railroad bridge reopens, to pass all waiting vessels.
- What is the vertical clearance of Old Roosevelt Bridge?
- The vertical clearance in the closed position is approximately 14 ft at mean high water. Vessels requiring more clearance need an opening.
- Do I need to request an opening?
- Vessels that cannot pass under the closed span signal the bridge tender for an opening, as provided by US Coast Guard drawbridge regulations (33 CFR Part 117).
Know before you go
IsBridgeUp shows live drawbridge status, opening patterns, and vessel radar — free in your browser, no install needed.
Open the app