Sunrise Boulevard Bridge
Live status of Sunrise Boulevard Bridge updates in real time in the IsBridgeUp app; typical patterns are below.
Opening schedule
The draw opens on the hour and half-hour, year-round. On the first weekend in May the draw need not open from 4:00–6:00 PM on Saturday and Sunday, nor from 9:45–10:45 PM on the first Saturday (Fort Lauderdale Air Show).
Regulation: 33 CFR 117.261(x)
Monthly opening statistics — June 2026
Span: Eastbound
Openings by hour of day (ET)
Based on 15 days with FL511 data in June 2026. Partial month: fewer than 20 days of usable feed data — treat averages as indicative.
Span: Westbound
Openings by hour of day (ET)
Based on 28 days with FL511 data in June 2026.
Vessel traffic — June 2026
By vessel type
- Recreational271
- Towing / tug0
- Passenger10
- Cargo / tanker3
- Other / unknown12
Counts include AIS-broadcasting vessels only; actual vessel traffic is higher.
About the bridge
The East Sunrise Boulevard Bridge carries State Road 838 over the Atlantic Intracoastal Waterway in Fort Lauderdale as a pair of bascule structures dating to 1987 and 1989. It is owned by the Florida Department of Transportation.
Physical characteristics
| Vertical clearance, closed (MHW) | 25 ft |
| Bridge type | bascule |
| Year built | 1987 |
| Owner | Florida DOT (FDOT) |
| VHF channel (bridge tender) | Ch 9 |
Road traffic
Annual average daily traffic (AADT): 22,000
Frequently asked questions
- Is Sunrise Boulevard Bridge open right now?
- Sunrise Boulevard Bridge opens and closes for vessel traffic throughout the day. Live status is available on this page and updates in real time in the IsBridgeUp app.
- How often does Sunrise Boulevard Bridge open?
- In June 2026, Sunrise Boulevard Bridge opened 2 times — about 0.1 openings per day, with an average opening lasting 5.1 minutes.
- What is the opening schedule for Sunrise Boulevard Bridge?
- The draw opens on the hour and half-hour, year-round. On the first weekend in May the draw need not open from 4:00–6:00 PM on Saturday and Sunday, nor from 9:45–10:45 PM on the first Saturday (Fort Lauderdale Air Show).
- What is the vertical clearance of Sunrise Boulevard Bridge?
- The vertical clearance in the closed position is approximately 25 ft at mean high water. Vessels requiring more clearance need an opening.
- Do I need to request an opening?
- Vessels that cannot pass under the closed span signal the bridge tender for an opening, as provided by US Coast Guard drawbridge regulations (33 CFR Part 117).
Know before you go
IsBridgeUp shows live drawbridge status, opening patterns, and vessel radar — free in your browser, no install needed.