W 63rd St Bridge (Indian Creek)
Live status of W 63rd St Bridge (Indian Creek) updates in real time in the IsBridgeUp app; typical patterns are below.
Opening schedule
The draw opens on signal, except that daily from 7:00 AM–7:00 PM (except federal holidays) it opens only on the hour and half-hour, and Monday through Friday (except federal holidays) it stays closed to vessels from 7:10–9:55 AM and 4:05–6:59 PM. A reduced schedule also applies around the Miami Beach boat show each February.
Regulation: 33 CFR 117.293
Monthly opening statistics — June 2026
Openings by hour of day (ET)
Based on 19 days with FL511 data in June 2026. Partial month: fewer than 20 days of usable feed data — treat averages as indicative.
Vessel traffic — June 2026
By vessel type
- Recreational18
- Towing / tug0
- Passenger0
- Cargo / tanker0
- Other / unknown0
Counts include AIS-broadcasting vessels only; actual vessel traffic is higher.
About the bridge
The 63rd Street Bridge is a single-leaf bascule carrying 63rd Street over Indian Creek in Miami Beach. The original structure dates to 1953 and was reconstructed in 2009. In 2016, after a public comment period in which 497 of 508 responses were in favor, the Coast Guard restricted the bridge's peak-hour openings to reduce rush-hour traffic backups. The regulation also sets a reduced opening schedule each February around the Miami Beach yacht and brokerage show. The bridge is owned by the Florida Department of Transportation.
Physical characteristics
| Vertical clearance, closed (MHW) | 11 ft |
| Horizontal clearance | 50 ft |
| Bridge type | single-leaf bascule |
| Year built | 1953 |
| Owner | Florida DOT (FDOT) |
| VHF channel (bridge tender) | Ch 9 |
Frequently asked questions
- Is W 63rd St Bridge (Indian Creek) open right now?
- W 63rd St Bridge (Indian Creek) opens and closes for vessel traffic throughout the day. Live status is available on this page and updates in real time in the IsBridgeUp app.
- How often does W 63rd St Bridge (Indian Creek) open?
- In June 2026, W 63rd St Bridge (Indian Creek) opened 167 times — about 8.8 openings per day, with an average opening lasting 7.5 minutes.
- What is the opening schedule for W 63rd St Bridge (Indian Creek)?
- The draw opens on signal, except that daily from 7:00 AM–7:00 PM (except federal holidays) it opens only on the hour and half-hour, and Monday through Friday (except federal holidays) it stays closed to vessels from 7:10–9:55 AM and 4:05–6:59 PM. A reduced schedule also applies around the Miami Beach boat show each February.
- What is the vertical clearance of W 63rd St Bridge (Indian Creek)?
- The vertical clearance in the closed position is approximately 11 ft at mean high water. Vessels requiring more clearance need an opening.
- Do I need to request an opening?
- Vessels that cannot pass under the closed span signal the bridge tender for an opening, as provided by US Coast Guard drawbridge regulations (33 CFR Part 117).
Know before you go
IsBridgeUp shows live drawbridge status, opening patterns, and vessel radar — free in your browser, no install needed.
Open the app