Brickell Avenue Bridge
Live status of Brickell Avenue Bridge updates in real time in the IsBridgeUp app; typical patterns are below.
Opening schedule
Weekdays 7:00 AM–7:00 PM, the draw opens on the hour and half-hour, except during rush-hour curfews when it stays closed to vessels (tugs and emergencies excepted): 7:35–8:59 AM, 12:05–12:59 PM, and 4:35–5:59 PM. At all other times, including federal holidays, the draw opens on signal.
Regulation: 33 CFR 117.305(d)
Monthly opening statistics — June 2026
Openings by hour of day (ET)
Based on 27 days with FL511 data in June 2026.
Vessel traffic — June 2026
By vessel type
- Recreational759
- Towing / tug201
- Passenger1056
- Cargo / tanker121
- Other / unknown16
Counts include AIS-broadcasting vessels only; actual vessel traffic is higher.
About the bridge
The Brickell Avenue Bridge carries U.S. Route 1 across the mouth of the Miami River, linking downtown Miami with the Brickell district. The first bridge here opened in 1929; the current double-leaf bascule replaced it in 1995 and was widened in 2006 to add a northbound lane through the perennial downtown bottleneck. It is among the busiest and most-opened drawbridges in Florida — the Florida Department of Transportation recorded 4,990 openings in 2010 alone. The bridge also serves as a public monument. Commissioned by FDOT and completed in 1995 by Cuban-American sculptor Manuel Carbonell, 'The Pillar of History and the Tequesta Family' rises mid-span: a 53-foot bronze work whose 36-foot carved column narrates the lives of the Tequesta, Miami's first inhabitants, in 158 figures, topped by a 17-foot 'Tequesta Family' of a warrior aiming an arrow skyward beside his wife and child. Four bronze bas-reliefs on the piers honor Miami pioneers William and Mary Brickell, Henry Flagler, Julia Tuttle, and Marjory Stoneman Douglas. The crossing was recognized by the Federal Highway Administration for excellence in highway design.
Physical characteristics
| Vertical clearance, closed (MHW) | 23 ft |
| Bridge type | double-leaf bascule |
| Year built | 1995 |
| Owner | Florida DOT (FDOT) |
| VHF channel (bridge tender) | Ch 9 |
Road traffic
Annual average daily traffic (AADT): 33,500
Frequently asked questions
- Is Brickell Avenue Bridge open right now?
- Brickell Avenue Bridge opens and closes for vessel traffic throughout the day. Live status is available on this page and updates in real time in the IsBridgeUp app.
- How often does Brickell Avenue Bridge open?
- In June 2026, Brickell Avenue Bridge opened 629 times — about 23.3 openings per day, with an average opening lasting 9.4 minutes.
- What is the opening schedule for Brickell Avenue Bridge?
- Weekdays 7:00 AM–7:00 PM, the draw opens on the hour and half-hour, except during rush-hour curfews when it stays closed to vessels (tugs and emergencies excepted): 7:35–8:59 AM, 12:05–12:59 PM, and 4:35–5:59 PM. At all other times, including federal holidays, the draw opens on signal.
- What is the vertical clearance of Brickell Avenue Bridge?
- The vertical clearance in the closed position is approximately 23 ft at mean high water. Vessels requiring more clearance need an opening.
- Do I need to request an opening?
- Vessels that cannot pass under the closed span signal the bridge tender for an opening, as provided by US Coast Guard drawbridge regulations (33 CFR Part 117).
Nearby drawbridges
- Next covered bridge upstream: SW 2nd Avenue Bridge
- All Florida drawbridges →
Know before you go
IsBridgeUp shows live drawbridge status, opening patterns, and vessel radar — free in your browser, no install needed.
Open the app