SW 2nd Avenue Bridge
Live status of SW 2nd Avenue Bridge updates in real time in the IsBridgeUp app; typical patterns are below.
Opening schedule
The draw opens on signal at any time, except during weekday curfews — Monday through Friday (except federal holidays) from 7:35–8:59 AM, 12:05–12:59 PM, and 4:35–5:59 PM — when it stays closed to vessels.
Regulation: 33 CFR 117.305(c)
Monthly opening statistics — June 2026
Openings by hour of day (ET)
Based on 29 days with FL511 data in June 2026.
Vessel traffic — June 2026
By vessel type
- Recreational0
- Towing / tug23
- Passenger1018
- Cargo / tanker140
- Other / unknown17
Counts include AIS-broadcasting vessels only; actual vessel traffic is higher.
About the bridge
The SW 2nd Avenue Bridge stands at the most historic crossing point on the Miami River. The first bridge ever built over the river opened here in 1896 — originally the Avenue G Bridge — and gave Henry Flagler's railroad its crossing into the young city of Miami. That first structure relied on a turning basin rather than a modern draw. A second bridge, opening on April 9, 1924, was the first at the site to lift like the drawbridges seen today. The current bascule span, the third at this location, has carried traffic since 2003.
Physical characteristics
| Vertical clearance, closed (MHW) | 20 ft |
| Bridge type | bascule |
| Year built | 2003 |
| VHF channel (bridge tender) | Ch 9 |
Frequently asked questions
- Is SW 2nd Avenue Bridge open right now?
- SW 2nd Avenue Bridge opens and closes for vessel traffic throughout the day. Live status is available on this page and updates in real time in the IsBridgeUp app.
- How often does SW 2nd Avenue Bridge open?
- In June 2026, SW 2nd Avenue Bridge opened 656 times — about 22.6 openings per day, with an average opening lasting 6.4 minutes.
- What is the opening schedule for SW 2nd Avenue Bridge?
- The draw opens on signal at any time, except during weekday curfews — Monday through Friday (except federal holidays) from 7:35–8:59 AM, 12:05–12:59 PM, and 4:35–5:59 PM — when it stays closed to vessels.
- What is the vertical clearance of SW 2nd Avenue Bridge?
- The vertical clearance in the closed position is approximately 20 ft at mean high water. Vessels requiring more clearance need an opening.
- Do I need to request an opening?
- Vessels that cannot pass under the closed span signal the bridge tender for an opening, as provided by US Coast Guard drawbridge regulations (33 CFR Part 117).
Nearby drawbridges
- Next covered bridge downstream: Brickell Avenue Bridge
- Next covered bridge upstream: SW 1st Street Bridge
- All Florida drawbridges →
Know before you go
IsBridgeUp shows live drawbridge status, opening patterns, and vessel radar — free in your browser, no install needed.
Open the app