NW 22nd Avenue Bridge
Live status of NW 22nd Avenue Bridge updates in real time in the IsBridgeUp app; typical patterns are below.
Opening schedule
The draw opens on signal at any time, except during weekday rush-hour curfews — Monday through Friday (except federal holidays) from 7:35–8:59 AM and 4:45–5:59 PM — when it stays closed to vessels.
Regulation: 33 CFR 117.305(b)
Monthly opening statistics — June 2026
Openings by hour of day (ET)
Based on 25 days with FL511 data in June 2026.
Vessel traffic — June 2026
By vessel type
- Recreational51
- Towing / tug15
- Passenger19
- Cargo / tanker106
- Other / unknown9
Counts include AIS-broadcasting vessels only; actual vessel traffic is higher.
About the bridge
The NW 22nd Avenue Bridge is a bascule dating to 1964 that crosses an industrial stretch of the north fork of the Miami River, with freight terminals along its banks. It is maintained by Miami-Dade County.
Physical characteristics
| Vertical clearance, closed (MHW) | 25 ft |
| Horizontal clearance | 81 ft |
| Bridge type | bascule |
| Year built | 1964 |
| VHF channel (bridge tender) | Ch 9 |
Frequently asked questions
- Is NW 22nd Avenue Bridge open right now?
- NW 22nd Avenue Bridge opens and closes for vessel traffic throughout the day. Live status is available on this page and updates in real time in the IsBridgeUp app.
- How often does NW 22nd Avenue Bridge open?
- In June 2026, NW 22nd Avenue Bridge opened 241 times — about 9.6 openings per day, with an average opening lasting 7.2 minutes.
- What is the opening schedule for NW 22nd Avenue Bridge?
- The draw opens on signal at any time, except during weekday rush-hour curfews — Monday through Friday (except federal holidays) from 7:35–8:59 AM and 4:45–5:59 PM — when it stays closed to vessels.
- What is the vertical clearance of NW 22nd Avenue Bridge?
- The vertical clearance in the closed position is approximately 25 ft at mean high water. Vessels requiring more clearance need an opening.
- Do I need to request an opening?
- Vessels that cannot pass under the closed span signal the bridge tender for an opening, as provided by US Coast Guard drawbridge regulations (33 CFR Part 117).
Nearby drawbridges
- Next covered bridge downstream: NW 12th Avenue Bridge
- Next covered bridge upstream: NW 27th Avenue Bridge
- All Florida drawbridges →
Know before you go
IsBridgeUp shows live drawbridge status, opening patterns, and vessel radar — free in your browser, no install needed.
Open the app