West Flagler Street Bridge

Checking status…

Live status of West Flagler Street Bridge updates in real time in the IsBridgeUp app; typical patterns are below.

Vertical clearance (closed)
35 ft
Schedule
Timed openings + curfews
Avg openings/day
8.5
last full month

Opening schedule

The draw opens on signal at any time, except during weekday rush-hour curfews — Monday through Friday (except federal holidays) from 7:35–8:59 AM and 4:45–5:59 PM — when it stays closed to vessels.

Regulation: 33 CFR 117.305(b)

Monthly opening statistics — June 2026

Openings
256
Avg per day
8.5
Avg duration
8.2 min
Time with span up
4.9%
Weekday avg/day
9.1
Weekend avg/day
6.9

Openings by hour of day (ET)

00:00 — 601:00 — 102:00 — 403:00 — 504:00 — 305:00 — 306:00 — 1007:00 — 408:00 — 809:00 — 2510:00 — 2111:00 — 1512:00 — 1013:00 — 1914:00 — 1415:00 — 1416:00 — 1317:00 — 918:00 — 1419:00 — 1820:00 — 1521:00 — 922:00 — 723:00 — 900:0006:0012:0018:00

Based on 30 days with FL511 data in June 2026.

Vessel traffic — June 2026

AIS vessels observed at openings
314

By vessel type

  • Recreational
    0
  • Towing / tug
    8
  • Passenger
    209
  • Cargo / tanker
    89
  • Other / unknown
    8

Counts include AIS-broadcasting vessels only; actual vessel traffic is higher.

About the bridge

The West Flagler Street Bridge is a double-leaf bascule built in 1967, carrying westbound traffic out of downtown Miami as a companion to the SW 1st Street Bridge one block to the south. The two bridges work as a pair, and West Flagler served as the signed detour while SW 1st Street was rebuilt.

Physical characteristics

Vertical clearance, closed (MHW) 35 ft
Bridge type double-leaf bascule
Year built 1967
VHF channel (bridge tender) Ch 9

Frequently asked questions

Is West Flagler Street Bridge open right now?
West Flagler Street Bridge opens and closes for vessel traffic throughout the day. Live status is available on this page and updates in real time in the IsBridgeUp app.
How often does West Flagler Street Bridge open?
In June 2026, West Flagler Street Bridge opened 256 times — about 8.5 openings per day, with an average opening lasting 8.2 minutes.
What is the opening schedule for West Flagler Street Bridge?
The draw opens on signal at any time, except during weekday rush-hour curfews — Monday through Friday (except federal holidays) from 7:35–8:59 AM and 4:45–5:59 PM — when it stays closed to vessels.
What is the vertical clearance of West Flagler Street Bridge?
The vertical clearance in the closed position is approximately 35 ft at mean high water. Vessels requiring more clearance need an opening.
Do I need to request an opening?
Vessels that cannot pass under the closed span signal the bridge tender for an opening, as provided by US Coast Guard drawbridge regulations (33 CFR Part 117).